Green River Airport Runway Reconstruction
The pavement on Runway 13/31 demonstrated asphalt section failure. The existing asphalt pavement has exceeded the design life and showed signs of significant degradation. This reconstruction project utilized a 2022 FAA grant. The project was designed in three separate construction schedules to maximize the available funding. The runway replacement work included pulverization, earthwork, paving, erosion […]
Green River Airport Runway Reconstruction Read More »