By The Utah Asphalt Pavement Association
Granite
Project location: US-89; SR-203 to 40th St.
The US-89; SR-203 to 40th St. project involved the rehabilitation of the existing roadway on a very busy stretch on US-89 in Ogden, Utah. Due to the significant traffic counts passing through the corridor daily, this mill and overlay project was required to take place at night, with lane closures and intersection work being coordinated with both the Ogden Regional Medical Center and the local fire and police departments. The overlay work was later followed by grooved-in tape and epoxy paint operations in addition to various safety upgrades to the crash cushions, guardrail, signage, and pedestrian access ramps.