By The Utah Asphalt Pavement Association
Granite Construction
Project location: Wanship to Peoa
The project consists of rotomilling 3-inches of existing asphalt and replacing with 3-inches of new, fine graded HMA. Structure work (E1210, C-288, and F-457); removing existing asphalt, structural pothole patching and repaving paving back. Installing drainage structures and water quality control structure in Wanship. Soft spot repairs, reconstruction of pedestrian ramps, replacing and, when necessary, relocating signs, reestablishing all pavement markings and pavement messages.